Build the allowance
How to read this price
Starting allowance
For a straightforward, accessible job with a standard specification.
From £1,800
Typical UK project
An early planning range before a tradesperson inspects the property.
£2,500–£6,500
Likely programme
Site time varies with preparation, sequencing, approvals and drying periods.
3–7 days
These figures are early UK planning allowances. They are not a substitute for an itemised quotation after inspection.
Control the variables
What can change the quote?
Pipe and soil-stack alterations
Tiling area and tile format
Waterproofing and subfloor condition
Sanitaryware and brassware specification
Before accepting a quote
Ask for these details in writing
- Labour, materials and VAT
- Preparation and protection
- Access equipment and waste
- Named provisional allowances
- Testing and certification
- Programme and payment stages
- Making good and decoration
- Warranty and snagging process