Build the allowance
How to read this price
Starting allowance
For a straightforward, accessible job with a standard specification.
From £1,800
Typical UK project
An early planning range before a tradesperson inspects the property.
£80–£180/m²
Likely programme
Site time varies with preparation, sequencing, approvals and drying periods.
3–10 days
These figures are early UK planning allowances. They are not a substitute for an itemised quotation after inspection.
Control the variables
What can change the quote?
Excavation and spoil removal
Sub-base depth and ground conditions
Drainage and permitted-development rules
Edging, steps and access restrictions
Before accepting a quote
Ask for these details in writing
- Labour, materials and VAT
- Preparation and protection
- Access equipment and waste
- Named provisional allowances
- Testing and certification
- Programme and payment stages
- Making good and decoration
- Warranty and snagging process